Al Abyad Oil and Gas

Projects

Selected packages

Representative scopes delivered for onshore production assets and industrial park developments in Abu Dhabi. Client names and full references are available on request.

Structural steel members prepared for fabrication

Onshore platform steelwork

Structural platforms, gratings, stair treads, handrails and associated steelwork supplied to an onshore production asset. Project controls focused on material availability, schedule recovery and delivery prioritisation.

Environment
Onshore production field, Abu Dhabi
Quantity
Approx. 250 tonnes
Activities
Fabrication, welding, inspection, coating coordination, staged delivery
Coated fabricated sections stacked prior to dispatch

Piping spool package

Shop fabrication of piping spools for feedstock, utility and interconnecting pipeline systems at an industrial park development. Execution centred on spool and joint level traceability under controlled shop production.

Environment
Industrial park, gas-related piping package
Activities
Material control, fit-up, welding, NDT/PWHT, painting interface
Output
Dossier compiled progressively through fabrication
Fabricated hurdle supports in the yard prior to delivery

Flowline hurdle supports

Batch fabrication of 4 inch and 6 inch hurdle supports for oil flowline and water injection applications. Repeatable jigs and production tracking used to hold quality consistency across the batch.

Environment
Onshore flowline support works
Activities
Material preparation, fabrication, welding, dimensional inspection, coating, delivery
Large fabricated section on welding rollers in the shop

Shop fabrication & coating

Ongoing shop capacity for pipe supports, frames and structural assemblies, including blasting, painting and dimensional release prior to dispatch.

Facility
Abu Dhabi, UAE
Activities
Cutting, fit-up, welding, blasting, coating, dimensional release

How we run a package

Records arrive with the steel

Inspection status, weld records and material traceability are maintained as the work progresses, not reconstructed at handover.

  • Joint-by-joint inspection status tracking
  • Dimensional checks at fit-up and before final release
  • Controlled repair and NCR disposition
  • Progress reported by spool, weld-inch and tonnage
  • Final quality dossier compiled progressively
Temperature check being taken during welding

Need references?

Client names, certificates and the full company profile are available on request.

Email info@alabyaduae.com